Reporting on a grant: mistakes to avoid

SIH ONE — Desk Funding · 23 August 2025

Obtaining a grant is half the job. The other half — often underestimated — is reporting on it correctly. Reporting is the moment when the funding body checks that the funds were spent according to the rules of the call. A management error can turn into costs declared as ineligible, cuts to the contribution or, in serious cases, revocation and repayment with interest. The good news is that almost every mistake is predictable and avoidable with method.

The underlying principle: eligible costs only

Every programme defines which costs are eligible and under what conditions. Before spending anything, you must read the reference document: the rules differ between cantonal, federal and European instruments. In general, a cost is eligible if it:

  • is actually incurred and paid within the eligibility period;
  • is relevant to the project and provided for in the approved budget;
  • is documentable with proper supporting evidence;
  • respects the principles of cost-effectiveness and the company’s internal rules.

The eligibility period is a strict constraint: costs incurred before the start or after the closure of the project, save for the exceptions provided for, do not qualify.

The trickiest chapter: personnel

In R&D projects the largest item is almost always personnel cost, and it is where challenges concentrate. Critical points:

  • Timesheets: the hours charged to the project must be tracked with consistent, signed records, not reconstructed after the fact.
  • Hourly rate: it must be calculated according to the method set by the programme (gross pay, social security charges, annual productive hours), without including ineligible components.
  • Consistency: the hours declared across multiple funded projects cannot exceed the hours actually worked. Double funding of the same time is one of the most serious challenges.

An hour-tracking system active from the start of the project is worth more than any final reconstruction.

The audit trail: everything must be traceable

The guiding principle of every audit is traceability: from every declared amount you must be able to trace back to the original document and vice versa. In practice you need:

  • invoices and supporting documents correctly made out to the company;
  • proof of payment (bank statements), not just the invoice;
  • a clear link between expenditure, work package and approved budget;
  • contracts and orders for supplies and consultancy;
  • separate or coded accounting records for the project.

Keeping dedicated cost accounting for the grant from day one turns reporting into a collection exercise, not a frantic reconstruction.

The most common mistakes

  • Out-of-period expenses: incurred or paid outside the eligibility window.
  • Out-of-budget costs: items not provided for, or shifts between categories beyond the permitted margins without authorisation.
  • Incomplete documentation: invoice present but proof of payment missing, or supporting document not attributable to the project.
  • Timesheets missing or inconsistent with pay slips and attendance records.
  • Double funding: the same cost declared on two different instruments. Forbidden: a cost is funded only once.
  • VAT wrongly declared: where the tax is recoverable, it is not an eligible cost.
  • Unreported project changes: variations in budget, timing or partners that required the body’s approval.

Managing changes along the way

Projects evolve. When timing, budget or activities change, the rule is to communicate beforehand, not afterwards. Many programmes provide for amendment procedures: using them in time prevents a legitimate deviation from becoming a challenged cost. Silence, by contrast, is almost always penalising.

Retaining the documentation

The obligation does not end with the payment of the balance. Project documents must be retained for the period set by the call — often several years after closure — because controls can arrive even long afterwards. An archive organised by work package and by cost item is the best insurance against a late audit.

How we help

We help companies set up grant management from the outset: dedicated cost accounting, an hour-tracking system, procedures for costs and changes, and preparation of the report with a complete audit trail. The goal is to reach the control with no surprises and protect the full contribution obtained. Let’s talk about your project.

SIH ONE — Desk Funding

Content by the SIH ONE specialists. Professional responsibility always rests with licensed people: AI does the work, professionals sign. About us →

Continue

Funding

Discover →
Also read
Grants & funding

EIC Accelerator: how the person evaluating your dossier thinks

Read →
Grants & funding

How to finance a startup: the options between Switzerland and Europe

Read →